2018 UTILITY STRUCTURE STATUS UPDATE

FIBER OPTICS – Interior installations of fiber optic terminals and underground installation are complete.

HEATING/COOLING/HVAC REPLACEMENT – The new domestic hot water boilers were completed and began operation on September 21, 2017. The HVAC boilers will be completed and are operational. The chillers were replaced and are operational as of March 17, 2018. The Controller Panel was operational March 30, 2018.

PARKING LOT REPAIRS – The planned repairs were completed on October 26th 2017. AS A REMINDER, these were temporary repairs for the worst areas of the parking lot which were done to avoid having a special assessment to pay for the extensive repairs that are needed. There are many other areas that are failing, and it is expected that freezing conditions this winter will cause new potholes which will require repair.